TNPL

  • PULP MILL
  • FEED END BUILDING
  • FIRE END BUILDING & LIME KILN PIER
  • ACC PLANT
  • TG BUILDING
  • CHLORINE DIOXIDE PLANT
  • CHIPPER HOUSE
  • COOLING TOWER
  • D1-TOWER
  • EVAPORATOR TANKAGES
  • CENTRAL CONTROL ROOM
  • ADMINISTRATIVE BLOCK
  • PEB-WAREHOUSE
  • PIPE RACK STRUCTURE
  • WOOD CHIP SILO
  • CBSE SCHOOL

Key Features

  • Total Concrete Qty = 73540 m3
  • Total Shuttering Qty = 141740 sq m
  • Total Shuttering Slipform Qty = 2780 sq m
  • Total Steel Qty = 6522 MT
  • Pipe Rack Structure = 800 RMT