Civil and structural works for M/s National Institute of Ocean Technology at Pallikaranai, Chennai under Ministry of Earth & Sciences, Government of India in 18 Months

Building for Integration Faculty:

Building of size 60M x 20M x 12.50M with pile foundations, Pre Engineered building with crane brackets including roofing and side cladding using puff panels partly having two mezzanine floor for storage facility, heavy duty industrial Epoxy flooring,

Buoy Assembly building:

Building of size 60M x 12M, RCC framed structure partly covered with RCC slab and rest with Pre Engineering Structural roof, rest on pile foundation, stucco finished outside.

Buoy Assembly building:

Extension of existing VMC building, RCC framed structure having (G+2) floors rest on pile foundations, toilets, kota stone flooring, stucco finished etc.,

Buoy Assembly building:

Building of size 40M x 20M, RCC framed structure having two mezzanine floors restly on pile foundations with Pre Engineering Building roof, stucco finished outside.