Civil and architectural works on the coal handling plant,
including the emergency reclaiming hopper at the 2×660 MW Udangudi superthermal power plant project.
Key Structures:
Emergency Reclaiming Hopper at (-18.5M Depth)
Junction tower Foundation
Convey or Foundation
Coal shed Foundation
Stacker Cum Reclaimer
Space Frame Strucuture (Area = 135M x 134M Ridge Height at 35.74M)